CESMD |
Information for Strong-Motion Station |
Los Angeles - I10/La Cienega Bridge |
CGS - CSMIP Station 24704 |
Earthquakes recorded by this station |
Latitude | 34.0368 N |
Longitude | 118.3762 W |
Elevation (m) | 25 |
Site Geology | |
Vs30 (m/sec) | |
Site Class |
No. of Spans | 6 |
Plan Shape | Curved with skew. |
Total Length | 776.4' (236.7m). Bridge spans ranges from 120' (36.6m) to 143' (43.6m). |
Width of Deck | Ranges from 142' (43.3m) to 156' (47.5m) |
Construction Date | 1994 |
Instrumentation | 1994. 15 accelerometers on the bridge. |
Superstructure Type | 2 rows of concrete box girders joined along the centerline with a 2' closure pour. Closed end cantilever seat abutments. |
Substructure Type | Circular concrete columns. 3 or 4 columns per bent. |
Foundation Type | CIDH concrete piles support the columns. Steel piles support the abutments. |
Remarks | This bridge was instrumented under the interagency agreement between Caltrans and DOC. |